Menu
  • Home
  • Breaking News
  • Feature
    • Arts
    • Astrology
    • Business
    • Community
    • Employment
    • Event Stories
    • From the Pioneer
    • Government
    • Letters to the Editor
    • Non Profit News
    • Obituary
    • Public Safety
    • Podcast Interview Articles
    • Pioneer Pulse Podcast: Politics, Palette, and Planet – the Playlist
  • Weather
  • Guest Column
    • Perspectives
    • Don Backman Photos
    • Ardent Gourmet
    • Kitchen Maven
    • I’ve been thinking
    • Jim Heffernan
    • The Littoral Life
    • Neal Lemery
    • View From Here
    • Virginia Carrell Prowell
    • Words of Wisdom
  • Things to do
    • Calendar
    • Tillamook County Parks
    • Tillamook County Hikes
    • Whale Watching
    • Tillamook County Library
    • SOS Community Calendar
  • About
    • Contribute
    • Advertise
    • Subscribe
    • Opt-out preferences
  • Post Submission Test
  • Search...
Menu

Highway 101/6 Project Update

Posted on April 9, 2017February 2, 2023 by

After extended discussion, and multiple schedule revisions, at this week’s ODOT project team meeting, the contractors and agency partners concluded that, in order to expedite the Pacific Avenue sidewalk work, additional crew resources would be put into grading and finishing the last conduit work on the west Pacific sidewalk between 2nd and 3rd this week so that the concrete can start to be poured next Tuesday and then reopened for foot traffic by the week thereafter.

While the flatwork is being poured, all the digging and curbline work would continue across the 2nd Street intersection so that the concrete work could follow right behind.   Work on these first two segments would then lead to the demolition of the remaining west Pacific sidewalks up past the Rodeo.  Once that alignment is complete, the plan is to swing the concrete crews over to the Second Street Plaza, which should be graded and ready, and start them working the full street from east to west.  With the concentrated prep work leading the way, the concrete crews should be able to keep pouring continuously, without having to wait on subgrade stabilization, curb & gutter, or weather.

In order to make this approach function, the access to the Blue Moon Café would be flipped, moving back to their westward door with a boardwalk that would be constructed to Main.  The Phoenix Exchange, which has been struggling along with its limited access, has agreed to limit it even further by closing for a couple of days when the crews pour their access, rather than having their approach poured in halves to allow continuous access to their business.  That way, while the disruption is greater, it is for a shorter period of time as the entire entry would cure all at once.
Because these are going to be tough times for those businesses, please go out of your way to patronize them during this period while the intensity of the sidewalk work around their businesses increases in an effort to get it done faster.
In other project arenas, the installation of the electrical conduits for future undergrounding of wires is nearing completion under the impending plaza, thanks to a partnership of the project contractors, the City, the Urban Renewal Agency, and the Tillamook People’s Utility District.

The nightwork in front of Rosenberg’s has run smoothly so far, enabling the installation of the 18-inch storm drain tie-in crossings to be placed without too much traffic disruption.  There is still some storm drain work to come with the 30-inch and 36-inch tie-ins remaining to be completed on the north end.  The City’s waterline is already installed in the bridge and ready to be hooked up when the storm drains are done.

The bridge itself is going through its readiness checklist in anticipation of starting to pour the deck around the 13th of April.  This major construction element will take about a week to complete.

Our Highway Project E-news bulletin is created by Jeannell Wyntergreen, Highway 101/6 Project Liaison for the Tillamook Area Chamber of Commerce.   If you have any questions or would like to share a comment with the Chamber, contact her at hwyproject@tillamookchamber.org

.

Featured Video

Contribute SUBSCRIBE

Tillamook Weather

Tides

Tillamook County Pioneer Podcast Series

Tillamook Church Search

Cloverdale Baptist Church
Nestucca Valley Presbyterian
Tillamook Ecumenical Service

Archives

  • Home
  • EULA Privacy Policy
  • Contact
  • Opt-out preferences
  • Search...
Share on facebook
Facebook
Share on pinterest
Pinterest
Share on twitter
Twitter
Share on linkedin
Linkedin
Catherine

Recent Posts

  • TILLAMOOK COUNTY PIONEER WEEK IN REVIEW 5/8/25

    May 8, 2025
  • Exciting News for North County Recreation District – Congratulations to Barbara McCann on Retirement; Welcome New Executive Director, Justin Smith; Special Saturday Swims this Spring to Honor Legacy Pool – May 10 & June 14

    May 8, 2025
  • "I Pledge Allegiance" ... We Take an Oath

    May 8, 2025
©2025 | Theme by SuperbThemes
Menu
  • Home
  • Breaking News
  • Feature
    • Arts
    • Astrology
    • Business
    • Community
    • Employment
    • Event Stories
    • From the Pioneer
    • Government
    • Letters to the Editor
    • Non Profit News
    • Obituary
    • Public Safety
    • Podcast Interview Articles
    • Pioneer Pulse Podcast: Politics, Palette, and Planet – the Playlist
  • Weather
  • Guest Column
    • Perspectives
    • Don Backman Photos
    • Ardent Gourmet
    • Kitchen Maven
    • I’ve been thinking
    • Jim Heffernan
    • The Littoral Life
    • Neal Lemery
    • View From Here
    • Virginia Carrell Prowell
    • Words of Wisdom
  • Things to do
    • Calendar
    • Tillamook County Parks
    • Tillamook County Hikes
    • Whale Watching
    • Tillamook County Library
    • SOS Community Calendar
  • About
    • Contribute
    • Advertise
    • Subscribe
    • Opt-out preferences
  • Post Submission Test
  • Search...

Manage Cookie Consent
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Manage options Manage services Manage {vendor_count} vendors Read more about these purposes
View preferences
{title} {title} {title}