We’re inspecting two bridges on OR 130 to make sure they’re in good condition.
The inspection will take us about two days to complete.
You can expect:
- Full OR 130 road closure from 8 a.m. to 5 p.m. on May 13 and May 14.
- Local access only on OR 130 on either side of the bridge that’s closed.
- Signed detour using U.S. 101 and OR 22.
We don’t plan on closing both bridges at the same time. We plan to close and inspect the first bridge on May 13 and the second bridge on May 14.
|
Our schedule may change, please visit TripCheck.com for the most up to date information on road closures and traffic impacts. |
|
|
Check out what we’re building in and around your community!
See what else is being constructed on the roads around your community by visiting our webpage. You can explore our interactive map to see what we’re working on.
Pay attention in work zones, slow down and move over – imagine this is where you work! Always drive safely, watch for construction signs and workers.
Remember that fines double in all Oregon work zones, whether workers and signs are present or not. |